【转】SAP PP 顾问面试考试试题及资料

  SAP PP 顾问面试试题及资料
  1.   Master Data
  Organizational Structures
  ·         What are the various organizational structures in the R/3 System?
  ·         Which R/3 organizational structures are used primarily for PP?
  ·         What is the relation between controlling area, company code, valuation area, plant and storage location
  Material Master
  ·         What is the purpose of different material master views?
  ·         Which views are available?
  ·         Which views are used primarily for PP?
  ·         What is the relationship between material master views and individual organizational structures?
  ·         How does the industry sector influence the material master maintenance?
  ·         How does the material type influence the material master maintenance?
  ·         What is the difference between external and internal number assignment and how is it set up in Customizing?
  ·         Which other factors can influence the selection of fields in the material master?
  ·         How can MRP profile and forecast profile be used to optimize material master maintenance?
  ·         How can a material master be reorganized (deleted/archived)?
  ·         Which units of measure can affect processing in the material master (base unit of measure, production unit, order unit, etc.)?
  ·         What is the material status used for and on which levels could it be maintained?
  ·         Review the usage of the following settings?
  -          MRP group
  -          MRP type
  -          Reorder point
  -          Planning time fence
  -          MRP controller
  -          Lot size
  -          Procurement type
  -          Special procurement type
  -          Production storage location
  Backflush flag
  -          Stock determination group
  -          Bulk material
  -          Scheduling margin key
  -          Safety stock
  -          Strategy group
  -          Consumption mode and consumption period
  -          Availability checking group
  -          Alternative selection flag
  -          Dependent requirement flag for individual and collective requirements
  -          Production scheduler
  -          Production scheduling profile
  -          Underdelivery/overdelivery tolerance
  -          In-house production time (lot size dependent/independent)
  -          Valuation class
  -          Price control indicator
  -          Moving average price/standard price
  Bills of Material
  ·         What is determined by BOM usage?
  ·         What technical types of BOM are available?
  ·         Can the technical type of a BOM be changed?
  ·         During which processes will BOM usage and status be considered?
  ·         When would it be useful to make use of a Group BOM?
  ·         What is meant by area of validity and effectivity of a BOM?
  ·         Which item categories are available and what are their specifications?
  ·         What is a sub-item?
  ·         Under which circumstances could a BOM be recursive and what the usage of the recursive indicator?
  ·         What is the usage of the following BOM settings?
  -          Explosion type
  -          Relevant to production
  -          Relevant to costing
  -          Material provision indicator
  -          Bulk material
  -          Production storage location
  Work Centers
  ·         What is a work center category?
  ·         What data can be maintained on the various views (basic, default, capacity, scheduling, costing, etc.)?
  ·         What is the purpose of a standard value key?
  ·         What role does the operation control key play?   
What does referencing mean?
  ·         Why to use a work center hierarchy?   
What is a pooled capacity?
  ·         Analyze the usage of the following fields?
  -          Backflush indicator
  -          Capacity category
  -          Formulas for determining capacity requirements
  -          Rate of capacity utilization
  -          Relevant to finite scheduling indicator
  -          Overload
  -          Formulas for scheduling
  -          Location group (move time matrix)
  -          Queue times (normal and minimum)
  -          Cost center
  -          Activity types
  -          Formulas for costing
  Routings
  ·         What does a routing define?
  ·         How is a routing structured?
  ·         What task list types are available in the R/3 System?
  ·         What is a routing group and group counter?
  ·         What is a routing sequence, and what types of sequence are available?
  ·         What could be reasons to use sequences?
  ·         What are the various options to assign materials to routings?
  ·         Under which conditions would it make sense to assign components to operations?
  ·         What is a reference operation set?
  ·         How could the lotsize-dependend inhouse production time be calculated and updated into the material master?
  Production Resources/Tools
  ·         What types of PRT are available?
  ·         What is the relationship between PRTs and a routing/operation?
  Engineering Change Management
  ·         What are the objectives of Engineering Change Management?
  ·         What is the significance of changes with a history?
  ·         Which PP objects can be managed using Engineering Change Management?
  ·         What is the purpose of an engineering change request/order?
  ·         How is a change master record structured?
  ·         What is a revision level compared to engineering change master?
  Other Issues
  ·         Which scheduling options are available, and how do they differ from each other?
  ·         Which time components are taken into account during scheduling?
  ·         How are basic order dates determined?
  ·         How are the scheduled dates determined?
  ·         Which scheduling types are available in lead time scheduling?
  ·         What role do reduction measures play in scheduling?
  ·         What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?
  ·         What is external processing, and what conditions must be fulfilled before external processing can take place?
  ·         What are co-products?
  2.   Production Planning
  General Issues
  ·         What are the various planning levels available in R/3 PP?
  ·         What are the dependencies between Sales and Operations Planning, Demand Management, Long-Term-Planning and Material Requirements Planning?
  Sales and Operations Planning
  ·         What is the purpose of Sales and Operations Planning?
  ·         What is the structure of product groups and how could they be used in SOP/DM/LTP/MRP?
  ·         What is the purpose of proportion factors and aggregation factors within product groups?
  ·         Which planning methods are available in SOP?
  ·         Which sources are available as input data for SOP?
  ·         Which options are available for creating a sales plan in SOP?
  ·         Which options are available for creating an operations plan in SOP?
  ·         What is ‘disaggregation’?
  ·         How could the result of SOP be passed on to different planning tools within the PP planning environment?
  Demand Management
  ·         What is the purpose of Demand Management?
  ·         At which points is Demand Management integrated with Sales and Distribution?
  ·         Explain the main strategies in Make-to-Stock as well as in Make-to-Order planning logic. Pay attention to master data settings.
  ·         What does consumption respectively reduction mean in the context of planning strategies?
  ·         What role does the individual/collective requirements indicator in the material master have during make-to-order production?
  ·         What is a stocking level, and how can it be influenced?
  ·         Which types of availability check are available (ATP and check against planning) and what are the characteristics of these checks?
  ·         Explain the link between MRP group, strategy group, strategy and requirement class.
  ·         What settings could be made in requirements classes (on PP as well as on SD side)?
  ·         Explain the purposeof version management in Demand Management?
  Master Production Scheduling
  ·         Under which circumstances would you recommend the usage of MPS?
  ·         Compare the functionality of MPS with MRP?
  ·         What is meant by the ‘firming’ of procurement proposals, and how can this effect be achieved?
  ·         What is a planning time fence, and where is it defined?
  ·         What is a manual firming date, and where is it defined?
  ·         How can a planned order be ‘firmed’, and which firming indicators are available in a planned order?
  Material Requirements Planning
  ·         What is the purpose of MRP and how does it fit into the PP planning environment?
  ·         How would you organize MRP runs? Discuss the different options
  -          MRP for a plant – online
  -          MRP for a plant – in background
  -          MRP for a material (individual planning) - online
  ·         Which planning types are available (NEUPL, NETCH, NETPL)?
  ·         Which planning parameters are to be set in the application itself?
  ·         What is the function of the planning file?
  ·         What is meant by single-level planning, multi-level planning?
  ·         What is meant by interactive MRP?
  ·         What are the characteristics of an MRP scenario that is performed in simulation mode?
  ·         What is meant by low-level code and how is it considered in MRP?
  ·         What is a net requirements calculation?
  ·         Which buffers can be taken into account for the net requirements calculation in MRP (quantity buffer: safety stock, time buffer: safety time)?
  ·         What does lot-size calculation entail?
  ·         Which lot-sizing procedures are available in the R/3 System (static, periodic and optimizing procedures)? What are the characteristics of these lot-sizing procedures?
  ·         How does the procurement type defined in the material master affect MRP?
  ·         What is backward scheduling? What are the characteristics of backward scheduling?
  ·         What is the difference between basic scheduling and lead time scheduling?
  ·         How are the order due dates determined in basic scheduling?
  ·         How are the order due dates determined in lead time scheduling?
  ·         How does the in-house production time defined in the material master affect scheduling?
  ·         How does the scheduling margin key affect scheduling?
  ·         How are BOMs selected in MRP? Which criteria are taken into account during BOM selection?
  ·         What is a ‘BOM selection ID’?
  ·         How are alternative BOMs selected?
  ·         What is a production version?
  ·         How are routings selected in MRP? Which criteria are taken into account during routing selection?
  ·         What is an MRP list? What is a stock/requirements list? How are these lists structured? What are the differences between these lists?
  ·         What is the function of exception messages?
  ·         What are planned orders?
  ·         What is meant by the individual/collective conversion of planned orders?
  ·         What is meant by “days’ supply” and “receipt days’ supply”?
  ·         How can component discontinuation be managed in MRP?