642-902 ROUTE Exam Topics
Exam Description
  The Implementing Cisco IP Routing (ROUTE 642-902) is a qualifying exam for the Cisco Certified Network Professional CCNP®, Cisco Certified Internetwork Professional CCIP®, and Cisco Certified Design Professional CCDP® certifications. The ROUTE 642-902 exam will certify that the successful candidate has the knowledge and skills necessary to use advanced IP addressing and routing in implementing scalable and secure Cisco ISR routers connected to LANs and WANs.  The exam also covers configuration of secure routing solutions to support branch offices and mobile workers.
Exam Topics
  The following information provides general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes the guidelines below may change at any time without notice.
Implement an EIGRP based solution, given a network design and a set of requirements
  · Determine network resources needed for implementing EIGRP on a network
  · Create an EIGRP implementation plan
  · Create an EIGRP verification plan
  · Configure EIGRP routing
  · Verify EIGRP solution was implemented properly using show and debug commands
  · Document results of EIGRP implementation and verification
Implement a multi-area OSPF Network, given a network design and a set of requirements
  · Determine network resources needed for implementing OSPF on a network
  · Create an OSPF implementation plan
  · Create an OSPF verification plan
  · Configure OSPF routing
  · Verify OSPF solution was implemented properly using show and debug commands
  · Document results of OSPF implementation and verification plan
Implement an eBGP based solution, given a network design and a set of requirements
  · Determine network resources needed for implementing eBGP on a network
  · Create an eBGP implementation plan
  · Create an eBGP verification plan
  · Configure eBGP routing
  · Verify eBGP solution was implemented properly using show and debug commands
  · Document results of eBGP implementation and verification plan
Implement an IPv6 based solution, given a network design and a set of requirements
  · Determine network resources needed for implementing IPv6 on a network
  · Create an IPv6 implementation plan
  · Create an IPv6 verification plan
  · Configure IPv6 routing
  · Configure IPv6 interoperation with IPv4
  · Verify IPv6 solution was implemented properly using show and debug commands
  · Document results of IPv6 implementation and verification plan
Implement an IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements
  · Create a redistribution implementation plan based upon the results of the redistribution analysis
  · Create a redistribution verification plan
  · Configure a redistribution solution
  · Verify that a redistribution was implemented
  · Document results of a redistribution implementation and verification plan
  · Identify the differences between implementing an IPv4 and IPv6 redistribution solution
Implement Layer 3 Path Control Solution
  · Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
  · Create a Layer 3 path control verification plan
  · Configure Layer 3 path control
  · Verify that a Layer 3 path control  was implemented
  · Document results of a Layer 3 path control implementation and verification plan
  · Implement basic teleworker and branch services
  · Describe broadband technologies
  · Configure basic broadband connections
  · Describe basic VPN technologies
  · Configure GRE
  · Describe branch access technologies
642-813 SWITCH Exam Topics (Blueprint)
Exam Description
  Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified Network Professional CCNP®, and Cisco Certified Design Professional CCDP® certifications. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco’s Campus Enterprise Architecture.  The SWITCH exam also covers secure integration of VLANs, WLANs, voice and video into campus networks.
Exam Topics
  The following information provides general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes the guidelines below may change at any time without notice.
Implement VLAN based solution, given a network design and a set of requirements
  · Determine network resources needed for implementing a VLAN based solution on a network
  · Create a VLAN based implementation plan
  · Create a VLAN based verification plan
  · Configure switch-to-switch connectivity for the VLAN based solution
  · Configure loop prevention for the VLAN based solution
  · Configure Access Ports for the VLAN based solution
  · erify the VLAN based solution was implemented properly using show and debug commands
  · Document results of VLAN implementation and verification
Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
  · Determine network resources needed for implementing a Security solution
  · Create a implementation plan for the Security solution
  · Create a verification plan for the Security solution
  · Configure port security features
  · Configure general switch security features
  · Configure private VLANs Configure VACL and PACL
  · Verify the Security based solution was implemented properly using show and debug commands
  · Document results of Security implementation and verification
Implement Switch based Layer 3 services, given a network design and a set of requirements
  · Determine network resources needed for implementing a Switch based Layer 3 solution
  · Create an implementation plan for the Switch based Layer 3 solution
  · Create a verification plan for the Switch based Layer 3 solution
  · Configure routing interfaces Configure Layer 3 Security
  · Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
  · Document results of Switch based Layer 3 implementation and verification
Prepare infrastructure to support advanced services
  · Implement a Wireless Extension of a Layer 2 solution
  · Implement a VoIP support solution
  · Implement video support solution
Implement High Availability, given a network design and a set of requirements
  · Determine network resources needed for implementing High Availability on a network
  · Create a High Availability implementation plan
  · Create a High Availability verification plan
  · Implement first hop redundancy protocols
  · Implement switch supervisor redundancy
  · Verify High Availability solution was implemented properly using show and debug commands
  · Document results of High Availability implementation and verification
642-832 TSHOOT Exam Topics (Blueprint)
Exam Description
  Troubleshooting and Maintaining Cisco IP Switched Networks (TSHOOT 642-832) is a qualifying exam for the Cisco Certified Network Professional CCNP®, certification. The TSHOOT 642-832  exam will certify that the successful candidate has important knowledge and skills necessary to (1) plan and perform regular maintenance on complex enterprise routed and switched networks and (2) use technology-based practices and a systematic ITIL-compliant approach to perform network troubleshooting.
Exam Topics
  The following information provides general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes the guidelines below may change at any time without notice.
Maintain and monitor network performance
  · Develop a plan to monitor and manage a network
  · Perform network monitoring using IOS tools
  · Perform routine IOS device maintenance
  · Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer
Troubleshoot Multi Protocol system networks
  · Troubleshoot EIGRP
  · Troubleshoot OSPF
  · Troubleshoot eBGP
  · Troubleshoot routing redistribution solution
  · Troubleshoot a DHCP client and server solution
  · Troubleshoot NAT
  · Troubleshoot first hop redundancy protocols
  · Troubleshoot IPv6 routing
  · Troubleshoot IPv6 and IPv4 interoperability
  · Troubleshoot switch-to-switch connectivity for the VLAN based solution
  · Troubleshoot loop prevention for the VLAN based solution
  · Troubleshoot Access Ports for the VLAN based solution
  · Troubleshoot private VLANS
  · Troubleshoot port security
  · Troubleshoot general switch security
  · Troubleshoot VACL and PACL
  · Troubleshoot switch virtual interfaces (SVIs)
  · Troubleshoot switch supervisor redundancy
  · Troubleshoot switch support of advanced services (i.e., Wireless, VOIP and Video)
  · Troubleshoot a VoIP support solution
  · Troubleshoot a video support solution
  · Troubleshoot Layer 3 Security
  · Troubleshoot issues related to ACLs used to secure access to Cisco routers
  · Troubleshoot configuration issues related to accessing the AAA server for authentication purposes
  · Troubleshoot security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)

运维网声明 1、欢迎大家加入本站运维交流群:群②:261659950 群⑤:202807635 群⑦870801961 群⑧679858003
2、本站所有主题由该帖子作者发表,该帖子作者与运维网享有帖子相关版权
3、所有作品的著作权均归原作者享有,请您和我们一样尊重他人的著作权等合法权益。如果您对作品感到满意,请购买正版
4、禁止制作、复制、发布和传播具有反动、淫秽、色情、暴力、凶杀等内容的信息,一经发现立即删除。若您因此触犯法律,一切后果自负,我们对此不承担任何责任
5、所有资源均系网友上传或者通过网络收集,我们仅提供一个展示、介绍、观摩学习的平台,我们不对其内容的准确性、可靠性、正当性、安全性、合法性等负责,亦不承担任何法律责任
6、所有作品仅供您个人学习、研究或欣赏,不得用于商业或者其他用途,否则,一切后果均由您自己承担,我们对此不承担任何法律责任
7、如涉及侵犯版权等问题,请您及时通知我们,我们将立即采取措施予以解决
8、联系人Email:admin@iyunv.com 网址:www.yunweiku.com

所有资源均系网友上传或者通过网络收集,我们仅提供一个展示、介绍、观摩学习的平台,我们不对其承担任何法律责任,如涉及侵犯版权等问题,请您及时通知我们,我们将立即处理,联系人Email:kefu@iyunv.com,QQ:1061981298 本贴地址:https://www.yunweiku.com/thread-135234-1-1.html 上篇帖子: 最近终于可以平稳过渡了,我的心绪。 下篇帖子: CCNP_route笔记6 关于OSPF中的hello和DBD顺序
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

扫码加入运维网微信交流群X

扫码加入运维网微信交流群

扫描二维码加入运维网微信交流群,最新一手资源尽在官方微信交流群!快快加入我们吧...

扫描微信二维码查看详情

客服E-mail:kefu@iyunv.com 客服QQ:1061981298


QQ群⑦:运维网交流群⑦ QQ群⑧:运维网交流群⑧ k8s群:运维网kubernetes交流群


提醒:禁止发布任何违反国家法律、法规的言论与图片等内容;本站内容均来自个人观点与网络等信息,非本站认同之观点.


本站大部分资源是网友从网上搜集分享而来,其版权均归原作者及其网站所有,我们尊重他人的合法权益,如有内容侵犯您的合法权益,请及时与我们联系进行核实删除!



合作伙伴: 青云cloud

快速回复 返回顶部 返回列表