设为首页 收藏本站
查看: 657|回复: 0

[经验分享] SAP Upgrade Strategy

[复制链接]
累计签到:1 天
连续签到:1 天
发表于 2015-9-19 12:33:02 | 显示全部楼层 |阅读模式
  Detail information, pls check website: http://sap-abaper.com
  Upgrade Stages
For Phase 1 – SAP Upgrade, the enhanced ASAP
methodology is used. Below are the high-level
steps to be completed for a successful upgrade.
Stage 1 – Project Preparation
· Determine Upgrade Project Organization –structure, roles, people
· Define Project Procedures –documentation, monitoring, issue resolution
· Technical Requirements Planning –hardware, software, tools
· Upgrade Preparation
· hardware/software requirements
· detailed technical upgrade plan - minimize down-time
· contingency
Stage 2 – Business Blueprint
· Identify Functionality Enhancements
· Identify and document new/modified business scenarios
· Prioritize and select enhancements for
Phase 1
· Identify Technical Objects
· Prepare Technical Objects inventory
· Identify Usage of Technical Objects
· Identify strategy for Technical Objects
· Identify Impact of Upgrade on Technical Objects
· Identify Archiving parameters
· Review scope / Prepare firm estimate for subsequent stages
· Set-up Off-site Development Environment
  Stage 3 – Realization
· Upgrade and Test Development System (DEV)
· Perform DEV System Upgrade
· Perform Upgrade of Technical Objects
· Archival of data in DEV System
· Configure new / changed processes
· Perform Integration Testing in DEV
· Develop Quality Assurance System (QAS)
· Install Hardware and Software for QAS
· Repeat Technical Upgrade Steps
· Import changes from DEV system
· Test QAS
· Set up and Test Connectivity
Stage 4 – Final Preparation
· Adapt End User Materials
· Perform End User Training
· Put Contingency Plan in Place
· Take Production System Backup
Stage 5 – Go Live and Support
· Transport Production System to Off-site
· Production system upgrade
· Repeat technical upgrade steps
· Import corrections from upgraded QA system
· Archive application data
· Post-upgrade support
  Summary of Project Deliverables
The main deliverables DynPro will produce or contribute to at each stage of the Upgrade process are listed:
Initial Project Plan
Project Standards and Procedures
Technical System Architecture Document
Project Kick-Off Meeting
Business Blueprint
Development System
Environment Installation
Business Blueprint Document, including
Enhancements – Wish List, and scope
for Phase 1
Custom Technical Objects Inventory – with
upgrade strategy
Requirements for Additional Development
Archiving Specifications
Committed implementation Plan and Cost
Updated Project Plan
Configuration of SAP and Enhancements
Development of Agreed Additional
Development
Security Set-Up
Test Plans and Scenarios
Converted Technical Objects
Quality System Environment Installation
Integration Test
Re-updated Project Plan
Support Team Documentation
Support Team Training
Cut-Over Plans
Production System Environment Installation
Upgrade of Production System
Production Support
Project Evaluation

运维网声明 1、欢迎大家加入本站运维交流群:群②:261659950 群⑤:202807635 群⑦870801961 群⑧679858003
2、本站所有主题由该帖子作者发表,该帖子作者与运维网享有帖子相关版权
3、所有作品的著作权均归原作者享有,请您和我们一样尊重他人的著作权等合法权益。如果您对作品感到满意,请购买正版
4、禁止制作、复制、发布和传播具有反动、淫秽、色情、暴力、凶杀等内容的信息,一经发现立即删除。若您因此触犯法律,一切后果自负,我们对此不承担任何责任
5、所有资源均系网友上传或者通过网络收集,我们仅提供一个展示、介绍、观摩学习的平台,我们不对其内容的准确性、可靠性、正当性、安全性、合法性等负责,亦不承担任何法律责任
6、所有作品仅供您个人学习、研究或欣赏,不得用于商业或者其他用途,否则,一切后果均由您自己承担,我们对此不承担任何法律责任
7、如涉及侵犯版权等问题,请您及时通知我们,我们将立即采取措施予以解决
8、联系人Email:admin@iyunv.com 网址:www.yunweiku.com

所有资源均系网友上传或者通过网络收集,我们仅提供一个展示、介绍、观摩学习的平台,我们不对其承担任何法律责任,如涉及侵犯版权等问题,请您及时通知我们,我们将立即处理,联系人Email:kefu@iyunv.com,QQ:1061981298 本贴地址:https://www.yunweiku.com/thread-115818-1-1.html 上篇帖子: SAP应用界面开发:5)Report List报表开发(2) 下篇帖子: C#如何通过NCO3.0来连接SAP并调用SAP中的RFC
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

扫码加入运维网微信交流群X

扫码加入运维网微信交流群

扫描二维码加入运维网微信交流群,最新一手资源尽在官方微信交流群!快快加入我们吧...

扫描微信二维码查看详情

客服E-mail:kefu@iyunv.com 客服QQ:1061981298


QQ群⑦:运维网交流群⑦ QQ群⑧:运维网交流群⑧ k8s群:运维网kubernetes交流群


提醒:禁止发布任何违反国家法律、法规的言论与图片等内容;本站内容均来自个人观点与网络等信息,非本站认同之观点.


本站大部分资源是网友从网上搜集分享而来,其版权均归原作者及其网站所有,我们尊重他人的合法权益,如有内容侵犯您的合法权益,请及时与我们联系进行核实删除!



合作伙伴: 青云cloud

快速回复 返回顶部 返回列表