设为首页 收藏本站
查看: 937|回复: 0

[经验分享] SAP MRP3 View

[复制链接]

尚未签到

发表于 2015-9-20 09:29:54 | 显示全部楼层 |阅读模式
  MRP 3 View:
  The following are the fields in MRP 3 View:
  

  
  
  Strategy Group:
  A Strategy Group represents the procedure used for planning a material. Primarily for Made to Stock the strategy is “10” in SAP and for Made to Order the Strategy is “20” in SAP.
  
  There are many other strategies in the system other than Made-to-order and Made-to-Stock like
  
  a) Planning with final assembly - Strategy Group or Strategy = 40
  
  This is a made-to-stock scenario where production is not only driven by planned independent requirements set in MD61 for a material, but any shortage in stock which are recognized by the incoming sales orders are also covered by MRP. Therefore the system plans for the quantities entered in planned independent requirement as well as plans for any shortages that may arise because of incoming demand.
  
  In a mere Made-to-stock scenario (Strategy = 10) , the production is only driven by planned independent requirements set in MD61 for a material and any shortage identified by incoming demand does not result in additional procurement proposals created in MRP to cover that shortage.
  
  You can use Strategy - 10, when you know that the forecasted demand is correct and you cannot afford to produce more than that.
  
  You can use Strategy - 40 when you want to accomodate for evergrowing changes in demand and satisfy the shortages not identified by the forecast.
  Note - Using Strategy 40 is wise.
  
  b) Make-to-Order - Strategy Group or Strategy = 20
  
  In a make-to-order scenario, the production is initiated upon receipt of an incoming customer requirement, i.e., production is made specifically for the customer requirements.
  
  In this case the production order and the stock is assigned to the customer order avioding any divertions to another customer demand for a similar or same product.
  
  
  Consumption Modes:
  The consumption mode controls the direction on the time axis in which the system consumes requirements.
    
  Backward Consumption period:
  
  Determines how far in the past on the time axis, the system should look for consuming the PIRS (planned independent requirement). The Sales Orders, Dependent Requirements, etc are assigned to & consume the PIR quantities that within this consumption period (before the requirements date
  
  Forward Consumption period:
  Determines how far in the future on the time axis, the system should look for consuming planned independent requirement. The Sales orders, Dependent Requirements, etc are assigned to & consume the PIR quantities that within this consumption period (after the requirements date).
  
  Availability Check:
  Using this field the system specifies whether and how the system checks availability and generates requirements for materials planning. It specifies which MRP elements the System takes into account (Purchase Orders, Production/Process Orders, etc) during availability check.

运维网声明 1、欢迎大家加入本站运维交流群:群②:261659950 群⑤:202807635 群⑦870801961 群⑧679858003
2、本站所有主题由该帖子作者发表,该帖子作者与运维网享有帖子相关版权
3、所有作品的著作权均归原作者享有,请您和我们一样尊重他人的著作权等合法权益。如果您对作品感到满意,请购买正版
4、禁止制作、复制、发布和传播具有反动、淫秽、色情、暴力、凶杀等内容的信息,一经发现立即删除。若您因此触犯法律,一切后果自负,我们对此不承担任何责任
5、所有资源均系网友上传或者通过网络收集,我们仅提供一个展示、介绍、观摩学习的平台,我们不对其内容的准确性、可靠性、正当性、安全性、合法性等负责,亦不承担任何法律责任
6、所有作品仅供您个人学习、研究或欣赏,不得用于商业或者其他用途,否则,一切后果均由您自己承担,我们对此不承担任何法律责任
7、如涉及侵犯版权等问题,请您及时通知我们,我们将立即采取措施予以解决
8、联系人Email:admin@iyunv.com 网址:www.yunweiku.com

所有资源均系网友上传或者通过网络收集,我们仅提供一个展示、介绍、观摩学习的平台,我们不对其承担任何法律责任,如涉及侵犯版权等问题,请您及时通知我们,我们将立即处理,联系人Email:kefu@iyunv.com,QQ:1061981298 本贴地址:https://www.yunweiku.com/thread-116085-1-1.html 上篇帖子: sap Basis 01 下篇帖子: SAP XI 开发步骤
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

扫码加入运维网微信交流群X

扫码加入运维网微信交流群

扫描二维码加入运维网微信交流群,最新一手资源尽在官方微信交流群!快快加入我们吧...

扫描微信二维码查看详情

客服E-mail:kefu@iyunv.com 客服QQ:1061981298


QQ群⑦:运维网交流群⑦ QQ群⑧:运维网交流群⑧ k8s群:运维网kubernetes交流群


提醒:禁止发布任何违反国家法律、法规的言论与图片等内容;本站内容均来自个人观点与网络等信息,非本站认同之观点.


本站大部分资源是网友从网上搜集分享而来,其版权均归原作者及其网站所有,我们尊重他人的合法权益,如有内容侵犯您的合法权益,请及时与我们联系进行核实删除!



合作伙伴: 青云cloud

快速回复 返回顶部 返回列表